top of page
Search

Its time to plan!

"Simplicity is a prerequisite for reliability." - Edsger Dijkstra

The redesigned HK 150 Heat King Mobile Glycol Heating System – a faster way to prepare foundation sites and cure concrete in cold weather. Smaller compact design allows for trouble free towing and placement around the jobsite.

With the increasing lead times we are experiencing these days, are you prepared for winter.

The Heat King uses only centrifugal pumps for the field and circulation loops. Safer than positive displacement pumps, they are engineered to eliminate dangerous pressure situations.

A powerful 150,000 BTU/HR burner. By using a coil for the heat exchanger, we are more durable and rugged than the competition who use boilers meant to be stationary.

The Heat King’s trailer features a rugged uni-body design and 4400lbs Leaf Springs for better towing. All doors can be locked during operation protecting the Heat King and any tools or equipment inside from tampering or theft.


The Heat King’s powered reel holds all 1400 feet of hose. Operation is controlled by a heavy duty CSA & UL approved foot switch leaving the hands free to control the hose.

PRECISE DIGITAL TEMPERATURE CONTROL The Heat King features digital temperature control and monitoring. With a touch of the button on the control panel, the Heat King’s output temperature can be changed in increments of 1 anywhere between 0-180 F.

USER FRIENDLY CONTROL PANEL All Heat King control panels feature large switches that can easily be used even with winter gloves on. The panel has a large emergency stop button that immediately stop all functions of the Heat King and a ground fault interrupt (GFI) breaker protect the entire system.

5 views0 comments

Recent Posts

See All

Exciting times

Arceneaux Sales group is excited to add Kubota, Metacaulk, and KYCS to our product line up!

bottom of page